Paech Road and Heysen Boulevard Intersection
Intersection with Connector Road Design
| What we're doing: | Design of a junction at the intersection of Paech Road and Heysen Boulevard |
|---|---|
| How much is it going to cost: | TBC |
| Timeframes: | TBC |
| Background: | Investigation work is underway to initiate a design project for inclusion in a future Annual Business Plan and Budget . In the interim we will undertake maintenance as required to hold the road in a satisfactory condition. We will consider whether some surface shape correction is needed to improve the ride quality of the road. It is expected that in early 2023 the Aston Hills developer will have completed road construction on Heysen Boulevard to give a continuous length of the Heysen Boulevard between Paech Road and Springs Road. We anticipate this will lift a significant volume of Aston Hills residential traffic off the Paech, Sims and Hartmann segments of road north of Heysen Boulevard. |