Stormwater Renewal Program
| What we're doing: | Council is committed to maintaining all Bridges, Culverts and Stormwater Assets in good condition to provide a safe environment with a number of items scheduled for renewal during the course of the financial year. |
|---|---|
| How much is it going to cost: | $230,000 |
| Timeframes: | 2026/27 |
| Background: | Identified in Asset Renewal Plans |
Financial Year 2026/27
| Township | Location | Project Details |
|---|---|---|
| Brukunga | Smilie Street | Stormwater pipe replacement |
| Brukunga | 6 Pyrites Drive | Stormwater pipe relining |
| Hahndorf | English Street to Bernhardt Court | Stormwater pipe renewal |
| Echunga | Adelaide Road | Stormwater pipe replacement |
| Mount Barker | CBD Flood Mitigation | Diversion drain |
| Meadows | Morris Road | Bridge construction |
| Nairne | North Road | Culvert design - deferred |
| Hahndorf | Balhannah Road | Culvert design - deferred |
| Location | Township | Financial Year | Project Details |
|---|---|---|---|
| Mollens Road | Hahndorf | 2025/26 | Stormwater extension |
| Smillie Street | Brukunga | 2025/26 | Stormwater Renewal Design |
| Pyrites Road | Brukunga | 2025/26 | Renewal |
| Fletcher Road | Mount Barker | 2025/26 | Stage 1B construction |
| Location | Township | Financial Year | Project Details |
|---|---|---|---|
| Springs Road Bridge | Mount Barker | 2023/24 | Design |
| Watts Road and Pyrites Road Drains | Brukunga | 2023/24 | Renewal |
| Molens and Kramm Road | hahndorf | 2023/24 | Renewal |
| Childs Road Stormwater | Littlehampton | 2023/24 | Design |
| Young Street | Kanmantoo | 2024/25 | Construction |
| Battunga Road Kerb and SEP | Echunga | 2024/25 | Design |
| Morris Road | Prospect Hill | 2024/25 | Construction |
| Roder Road Culvert | Meadows | 2024/25 | Construction |
| Kondoparinga Road | Meadows | 2024/25 | Construction |